Wednesday 26th September at Aldermaston.
A wet morning. As it's raining and as M is going back to Reigate today for her choir practice and we are on a 14 day mooring, there is no point in moving.
M left on the train at lunchtime, and on the way to the station we passed one of the shortest narrowboats we have seen.
Later, R did a conference call for Capture and then went for a walk between the rain showers. Well, it was supposed to be between the showers but he ended up getting soaked anyway. The electric swing bridge just downstream had three boats queueing to go through it and was jammed half open. Happily there was a guy from the Canal & River Trust there trying to fix it. R sheltered from the rain and watched to make sure that it was fixed as we will have to go through the bridge in a day or so.
M arrived home safely and said that the choir practice went well.
Today: Charged the batteries for 1.8 hours.
No comments:
Post a Comment